MTA/LIRR Expansion Project
Distinct Engineering Solutions Inc., is supporting MTA CC in managing the LIRR Expansion Project, consisting of approximately 9.8 miles of additional track infrastructure, including a new 3rd track and associated systems; grade crossing modifications; station and parking improvements; utility relocation; drainage improvements; substation replacements; as well as other improvements along the Main Line between Floral…

DESI – Special Seepage Evaluation is in Progress at NYCHA Redhook
Distinct Engineering Solutions, Inc., is supporting the Design Build Team of Tully and AECOM with Pre-construction Surveys; Instrumentation to monitor settlement, lateral movement vibration; Construction Inspection of piles, earthwork, and roadway pavement.

Foundations Designed by DESI are under construction for NYSDOT Rt 28 Bridge Project
Distinct Engineering Solutions Inc., will be providing special inspections and testing services for several NYCHA facade repairs following NYC DOB requirements on an on-call basis.

POSITION AVAILABLE: FIELD SPECIAL INSPECTOR
POSITION AVAILABLE: FIELD SPECIAL INSPECTOR LOCATION: NORTH BRUNSWICK, NJ Review and understand specifications, drawings, and scope of work for the project; apply local, State, and Federal environmental regulations; OSHA, ASTM standards; field investigation, data collection & evaluation; oversee field work, collection of soil, groundwater test, and air samples review results, develop tables, logs, and figures;…

Special Inspections for NYCHA
Distinct Engineering Solutions Inc., will be providing special inspections and testing services for several NYCHA facade repairs following NYC DOB requirements on an on-call basis.

Replacement of Landing Lane Bridge, Roxbury Township, NJ
In order to improve the capacity of the crossing and safety at the site, the County of Morris has identified the need to replace Landing Road Bridge over NJ Transit located in Roxbury Township. The existing bridge was constructed in 1907 and is classified as functionally obsolete due to inadequate deck. The existing 136’ long…